Durham Electric project controls workspace
Parse project records, summarize scope and constraints, draft submittal/RFI candidates, and keep material handoff review-gated. Scope, constraints, Q&A, drafts, and reviewed handoff.
Start here each day. Review what changed, what is blocked, and what needs to be finalized before handoff.
Prioritized work items with direct links into the workflow.
Run an analysis or import project sources to build the first action queue.
Internal draft preview for PM, estimator, and field handoff. Finalize manually at end of day.
No EOD draft yet. Complete intake and run analysis first.
Progress is based on source and review state, not button clicks.
Workbook, controls, EOD, and Remarcable readiness.
Focused view: dashboard
Add SharePoint, upload, or Procore source documents before asking questions, drafting controls, approving material rows, or preparing Remarcable handoff.
Complete the required prior review state before opening this step.
Start with uploaded files, SharePoint project records, or Procore records. Connector setup stays in Admin; this step only shows sources ready for the project workflow.
Use source PDFs, schedules, pasted text, and demo documents for local analysis.
Pull controlled folder metadata first, then extract file content for analysis.
Use Procore as an optional source system when the admin readiness gate is configured.
Connector import results appear here after SharePoint or Procore actions. Use Admin for credential readiness and raw audit output.
Classified drawings, specs, schedules, RFIs, submittals, and Procore records appear here before takeoff review.
Run an analysis to replace preview rows with classified source evidence.
Per-document scope contribution, constraints, QA flags, and reviewer action before Q&A, controls, or material approval.
Run analysis to summarize individual drawings, specs, schedules, submittals, RFIs, and addenda.
Procore-style control view for drawings, specs, submittals, RFIs, revisions, and unresolved scope blockers before material review.
Run analysis to classify drawings, specs, schedules, submittals, RFIs, and addenda.
Missing revisions and outdated-answer feedback appear here before approval or export.
Submittal and RFI candidates stay internal until edited and approved by a person.
Review source system, sheet/doc number, revision evidence, extraction state, scope use, blockers, and handoff policy before relying on project records.
Run analysis to replace this preview with controlled drawing, specification, schedule, submittal, RFI, and addendum rows.
Revision, ETag, Procore revision, and open answer-feedback signals to review before daily summaries or handoff.
Run analysis to check source revision evidence and open project-record feedback.
Summarizes what the job appears to include, what constraints override normal practice, and what needs a person to confirm.
Upload or import project files to summarize included scope, unclear scope, and cited source coverage.
Conduit, wire, support, enclosure, standards, testing, and manufacturer constraints appear here.
The assistant proposes draft log items and questions. Nothing is submitted without review.
End-of-day summaries will roll up changed project records, open questions, and Procore/Remarcable status.
Confirm whether the scope brief, requirements matrix, open issues, and action recommendations are ready to influence downstream work.
Ask project-scope questions. The assistant answers from the current project record first and says when the record is insufficient.
Use imported sources, Durham rules, metadata-only standards snapshots, and reviewer-attached references.
Refuse broad internet answers, uncited product assumptions, stale revisions, and copied paid-standard text.
Wrong, missing-source, or outdated answers create review items until a reviewer resolves the record.
Shows what the assistant may use, what is blocked, and what a reviewer must fix before relying on an answer.
Run an analysis to inspect the project-record, standards, external-evidence, AI-provider, and feedback boundaries.
Attach precise AHJ, vendor, manufacturer, or standards-metadata links to the project record before using them as evidence.
Precise lookup queue. Attach exact URLs below before Q&A, controls, or handoff can rely on outside evidence.
Run an analysis to see targeted AHJ, manufacturer, source-revision, and project-record lookup requests.
No external references attached. Answers stay limited to the project record until a reviewer attaches precise evidence.
Run an analysis, then ask about scope, constraints, submittals, RFIs, QA flags, standards, or material handoff readiness.
Wrong, missing-source, and outdated-revision answers stay open until a reviewer resolves the project record.
Ask a project question, then mark the answer correct, wrong, missing source, or outdated revision.
Review the secret-free daily summary before forwarding. Procore and Remarcable status should be synced before anyone sends the email.
Recommended roles appear here after the daily snapshot draft is available.
Changed documents, open questions, QA flags, and handoff state are summarized from the active run.
No email is sent by the hub. A person must review and forward the downloaded draft.
Confirm Procore source freshness, SharePoint/upload evidence, Remarcable status sync, high-QA state, and secret-free delivery mode before forwarding the daily EOD snapshot.
Run analysis to replace this preview with Procore, SharePoint/upload, Remarcable, and delivery-gate evidence.
Draft submittal, RFI, daily field report, and daily EOD items created from the project record. These stay internal until a person edits and approves them.
Spec and submittal-derived review items will appear here with source context.
Missing, conflicting, schematic-only, or not-estimated scope questions will appear here.
A daily field report draft will summarize scope status, blockers, and review notes for human editing.
The EOD summary rolls up changed records, open questions, QA, and material handoff state.
Decide whether RFI, submittal, daily report, or EOD draft outputs can be downloaded as an internal packet.
Live production gate status for SharePoint, Procore, Azure AI, standards metadata, reviewer approval, and Remarcable handoff.
Live run status, source coverage, takeoff confidence, QA flags, standards, and Remarcable handoff state.
No source documents analyzed yet.
Run an analysis to populate BOM candidates.
Durham review checks appear here.
Awaiting estimator review.
Edition metadata loads with each run.
No material requests exported.
Material candidates are one output of the scope assistant. Rows must show source, basis, confidence, and Durham QA state before Remarcable export.
Run an analysis to review candidate material rows.
Confirms the generated Excel workbook contains each Durham estimating section before review/download.
Run an analysis to inspect workbook tabs and row counts.
Confirm review gates before workbook, controls packet, EOD, or Remarcable outputs leave ScopeLine.
Run analysis and complete review gates to see handoff readiness.
After export, Remarcable owns procurement status while this hub keeps the source and approval audit trail.
Approved rows exported to Remarcable will appear here with request IDs, statuses, and source citations.
Follow the sequence for each project workspace. The guide updates as the active analysis run gains sources, answers, approvals, snapshots, and handoff records.
Every source is classified, versioned, and cited before it is used for scope, constraints, or material decisions.
Conduit, wire, supports, standards, exclusions, and unclear scope are separated from material takeoff rows.
Routes are built before quantities; route LF, conduit LF, and wire/cable LF stay separated.
Submittal/RFI/material drafts stay local until a person reviews the sources and approves the next action.
New projects get a fresh SiteAssets workspace, project libraries, source register, assumptions, RFI/submittal drafts, daily snapshots, and audit exports. Existing projects keep their recorded template version until intentionally upgraded.
Per-project setup checklist for the selected project profile, static config, source libraries, and upgrade evidence.
Each drawing, spec, schedule, submittal, or addendum is classified before quantities are trusted.
Analyzed source documents will appear here with estimate use and confidence.
Mark whether this source set is usable enough for Scope Review. Gaps remain visible downstream.
Drawing-specific meanings are captured with citations and must be confirmed before takeoff use.
Legend notes, symbols, and acronyms will appear here after analysis.
Durham oversight builds route assemblies before counting conduit LF or wire/cable LF.
Physical routes, duct banks, racks, trenches, and not-estimated warnings appear here.
AHJ Adoption Review lists project references first; latest known registry editions are shown separately with source links.
Run an analysis to snapshot exact standards editions and project references.
Open estimator risks, not-estimated quantities, and production assumptions stay visible before procurement.
Run an analysis to review QA flags, assumptions, exclusions, and unresolved export risks.
One secret-free handoff artifact for site package files, API checks, standards metadata, acceptance evidence, Durham export gates, and go-live validation.
Credentialed checks for SharePoint, Procore, Azure AI, standards metadata, review gates, and Remarcable vendor confirmation.
The static site hosts the UI; server-side routes own ingestion, analysis, exports, audit, and admin actions.
Use Azure app settings, Key Vault, Entra ID, OAuth, or a protected proxy for production credentials.
New project sites should start from the latest approved package; active projects stay pinned until upgraded.
Strict go-live needs real SharePoint, Procore, Azure, Remarcable, standards, and review-gate evidence.
Use public/config.json for static API host/key references only when an authenticated proxy is not available. Production secrets should live in Azure app settings, Key Vault, Entra ID, or vendor-managed OAuth flows.
Validate the configured project selector defaults before this workspace is used for intake, analysis, or handoff.